Slope Stabilization along Oregon’s Tualatin River
Permanent tied back soldier pile and lagging wall were used to stabilize these properties with great views of the river. Piles were driven 50 feet to the bedrock.
Permanent tied back soldier pile and lagging wall were used to stabilize these properties with great views of the river. Piles were driven 50 feet to the bedrock.